Premier Mounts Picked First Round for Rams' Draft Room

Project Value Call 800-368-9700 for details

  • Premier Mounts' MVWS-2X2-4655 video wall stand and TL72-MS2 lightweight dual-pole stands supported the St. Louis Rams' draft room during the NFL draft
  • Systems Integrator: TSI Technology Solutions
  • Completion Date: March 2013
  • Premier Mounts Sales Rep: Gina Schneider, RSM Central

The 2x2 video wall and static floor stands were customized to fit the location and designed with the owner for optimal functionality.

A total of eight (8) NEC X462UN displays were used with the two (2) MVWS-2X2-4655 video wall stands.

Premier Mounts' modular 2x2 video wall provides fine-tune alignment for each display provided by patent pending top-adjustable mounting brackets.

An RGB window processor was used as the main engine for the multiview video wall display.

The TL72-MS2 floor stand is a combination of the PSD-TL72 stand with the CTM-MS2 tilting mount. Displays can be adjusted with 12ยบ of tilt and built in lateral shift.

Systems integrator TSI Technology Solutions chose Premier Mounts' MVWS-2X2-4655 video wall stand and TL72-MS2 lightweight floor stand to set up the draft room for the St. Louis Rams for NFL draft support to take place on national television.

TSI Technology Solutions used Premier Mounts due to the quality workmanship, superior customer support, and overall easiness to work with. Choosing the 2x2 video wall stand and dual pole lightweight floor stand with tilting mounts to support eight (8) NEC X462UN displays in the St. Louis Rams' draft room, the installation was completed within a 30 day timeframe.

What was it like to work with Premier Mounts on this project?

"Premier Mounts service was second to none," stated Paul Murdick, CTS, President of TSI Technology Solutions. He continued, "Premier provided quality products with great support."

How well did Premier Mounts help to meet the deadline of the project?

"In a 30-day timeframe, Premier Mounts supplied all products on time, including last minute requests and changes," stated Murdick.

What was the biggest challenge, and how did Premier Mounts help with the success?

"Last minute requests can sometimes be challenging, but Premier was there above and beyond with support, helping us complete the installation on time," said Murdick.